Planting advice for farmers, estates & landowners
Plan your planting with confidence.
A useful starting point for woodland and native hedge planting in East Yorkshire and the wider North East: what shapes your quotation, how to prepare your site and when to plant cell-grown trees and hedges.
01 / Your quotation
What affects tree and hedge planting costs?
A useful planting quote starts with the work your site actually needs. Two projects with the same hedge length or woodland area can have different costs when their access, specification and ground conditions differ. Premier Forestry quotes for the agreed planting contract rather than advertising a single price that may not suit your land.
The details that shape a quotation
- Plant numbers and layout. Share your hedge length or woodland area, planting density and design. Open space, rides and unplanted areas matter when estimating woodland quantities.
- Planting stock and species. Include the species mix, stock type and size in your specification, and tell us what plants have already been arranged.
- Protection. Note the guards, stakes, shelters or fencing specified, and whether their supply and installation form part of the requested work.
- Ground conditions and access. Tell us about slope, vegetation, wet areas, gates, delivery access and the distance from unloading to the planting area.
- Preparation and aftercare. Clarify which tasks are already arranged and which you want priced. Watering, weed control, checking protection and replacing failed plants should have an agreed responsibility.
- Timing and scheme conditions. Share your intended planting period and approved agreement specification, where relevant.
Use our planting calculator for an initial estimate, then send your plan for a quotation. For example, 100 metres at six plants per metre gives 600 plants across the whole hedge; the density must still match your actual design.
02 / Site readiness
How to prepare for woodland or hedge planting
Good preparation makes the planting brief clearer and helps the work fit your site. Before any preparation starts, agree the design, check the relevant permissions and scheme conditions, and identify features that must be protected.
Start with a map and a walk around the site
- Mark the planting area. Show the proposed boundary or woodland layout, access points, gates, unplanted areas and any features to avoid.
- Describe the ground. Photos of vegetation, wet patches, slopes and existing boundaries help explain what the planting team will encounter.
- Plan access and unloading. Confirm where deliveries and the team can enter, where materials can be safely stored and how they reach the planting area.
- Agree vegetation management. Existing grass and weeds can compete with young plants. The preparation method should suit the soil, planting design and any approved specification.
- Think about protection. Explain livestock access and likely browsing pressure so the required guards, shelters or fencing are clear in the plan.
- Make an aftercare plan. Decide who checks plants and protection, manages competing growth, responds to dry conditions and arranges replacements.
The Woodland Trust's planting guidance explains site preparation and planting methods. Its woodland planning guide covers design considerations. Use your approved plan and site-specific advice when deciding what work to undertake.
For an agreed BN11 hedge project, use the full official planting specification. It sets requirements for preparation, planting, protection and establishment.
03 / Planting season
When can cell-grown trees and hedges be planted?
Premier Forestry's main cell-grown planting window is September to May. Cell-grown plants retain a root plug, but the calendar alone does not make every day suitable. Ground conditions, moisture, weather, plant handling and the approved specification still determine when work can go ahead.
Plan the season around your land
- September to November: finalise the planting brief, confirm site readiness and discuss an autumn start when conditions are suitable.
- December to February: planting can continue where weather and ground conditions allow. Frozen or waterlogged ground may mean postponing work.
- March to May: discuss spring planting alongside soil moisture, likely dry weather and the aftercare arrangements.
- June to August: use summer to plan the next project, confirm materials and care for plants already established.
Bare-root planting is commonly scheduled in the dormant season; the Woodland Trust describes its main tree planting season as November to March. Tell us which stock type your plan specifies so we can discuss an appropriate planting date.
Explore the cell-grown calendar and official funding links, or read about our woodland planting service and native hedge and BN11 planting service.
Turn your plan into a planting brief.
Send Will your site location, approximate woodland area or hedge length, any planting plan and the timing you have in mind. A rough brief is enough to start a conversation about the work and the details needed for a quotation.
Download the quotation checklist (PDF) · Call 07973 190203 · Email Will
Guidance reviewed 12 October 2026. General planning information; your approved design, agreement and site conditions determine the final planting specification. Sources: Woodland Trust planting and woodland planning guides, and GOV.UK BN11 guidance linked above.